How long does it take to build a website in NZ?

A website takes anywhere from a few days to a few months to build. Building it yourself on a builder can take a few days. A small site from a studio usually takes 2 days to 4 weeks. A larger custom site takes 1 to 3 months or more. An online store takes 4 to 12 weeks.

Where do those numbers come from?

Those ranges are typical, not measured. There is no official figure for how long a website takes, and the time depends more on how quickly the words and photos arrive than on how fast anyone builds.

Here is one real example from us. A Standard site from WebTag is live within 48 hours of getting your details, logo and photos. A Growth or Premium site takes 1 week. We are a web design studio in Auckland and we work with businesses all over New Zealand.

Two other New Zealand studios publish their own times. Kiwi Web Design says on its site that most of its projects are complete in 2 to 3 weeks from when it has your content and a signed-off brief. MOCA says on its site that a small site could take less than a month, but most of the sites it builds take 3 to 6 months. The two figures are far apart. The size and type of the site is the biggest reason a time varies.

How long does each type of website take?

Here are typical ranges for small business sites in New Zealand. They are general ranges, not measurements, and a real project can sit outside them.

Typical build times by type of site
Type of siteTypical timeWhere most of the time goes
You build it yourself on a website builderA few days to 3 weeksWriting the text, choosing photos and setting it up in your spare hours
A small site from a studio, up to about 5 pages2 days to 4 weeksWaiting for words, photos and a logo, then rounds of changes
A larger custom site, with its own design1 to 3 months, sometimes longerDesign rounds, writing every page and getting approvals
An online store4 to 12 weeksLoading products, setting up payments and delivery, testing orders

A Growth or Premium site from us takes 1 week, which is quicker than the larger custom range above. A later section explains why a quick build is not automatically a thin one. We do not include online stores with a cart in our packages, so the store range is a general figure only.

What actually takes the time?

Almost always the content. The building itself is the shorter part. A designer can lay out five pages quickly once the material exists. Waiting for the material is what stretches a project from days into weeks.

Four things hold most builds up.

  • The words. Every page needs text: what you do, who it is for, where you work and how to get in touch. Most owners have never written this down for a stranger. A first draft takes longer than expected, and a rewrite takes longer again.
  • The photos. Photos of your own premises, team or work make a site look like yours. If they still have to be taken, that adds days or weeks before anything else can finish.
  • The logo. If you need a logo, or the only copy you have is a screenshot, the site waits while that is sorted. A logo is a separate job from the site.
  • Access to your domain. Your domain is your web address, such as yourbusiness.co.nz. To point it at a new site, someone has to log in where it is registered and change a few settings. If nobody has the login, or an old web provider controls it, the site can be finished and still not be live.

Here is a real example. On one site we moved to new hosting for an Auckland community association, the build was ready before the web address was. The address was controlled by a previous provider, and the domain records, which are the settings that point an address at a website, took days to hand over. Even after the switch, some visitors kept seeing the old site for a few days because of settings saved on their own devices. The site was finished. The address was the hold-up.

A small habit avoids most of this. Find out who controls your domain before you start.

How long does a WebTag site take, step by step?

This is our process, in order. We design a free demo first, so you see the site before you decide anything.

  1. Answer a few quick questions. It takes about a minute.
  2. We design a free demo of your site, send it to your email and call you to talk it through.
  3. You get 2 rounds of changes before it goes live.
  4. We handle the domain, the hosting setup and going live. A Standard site is live within 48 hours of getting your details, logo and photos.
  5. After launch you change your own text, photos, hours and prices from your dashboard, and every enquiry lands there too.

The 48 hours starts when we have your details, logo and photos. That is why the list further down matters: the sooner those three are ready, the sooner the clock starts.

Page count and price move the timeline too. A Standard site is up to 5 pages and $699. A Growth site is 6 to 8 pages and $3,999. A Premium site is up to 10 pages and starts from $7,999. Every site is $39 a month for hosting, security, backups and your WebTag dashboard. See our pricing and what is included, or read how much a website costs in NZ for the wider picture.

What slows a website build down, and how do you avoid it?

  • Late content. Write the text and gather the photos before you start. If writing from a blank page is the problem, ask for a first draft to edit. We start a Standard site from a first draft of your current site or Google Business Profile, because editing is quicker than writing.
  • Too many people approving. Choose one person with the final say. Everyone else sends comments to that person, who sends one list.
  • Changes that arrive in pieces. Rounds of changes exist so the work can end. Collect all your feedback into one list for each round instead of sending it a line at a time.
  • Domain trouble. Find out who registered your domain, where, and who has the login. If an old provider has to hand something over, ask them early, as in the example above.
  • A growing page list. Agree the pages at the start. Each new page needs its own words and photos, and extra pages are quoted separately with us.
  • Slow replies. Each round waits on you as much as on the designer. Agree to answer within a day or two while the build is running.
  • Features that need setting up elsewhere. Bookings, payments and forms that connect to other software all need their own setup. Say at the start which ones you want.

What can you do this week to be ready?

An afternoon on this list is the most useful thing you can do for your date, whoever builds the site.

  • Find out who controls your domain, and get the login or the name of the person who has it.
  • Write down what you do, who for, where, the services and prices you want shown, your hours and your contact details. Plain notes are fine.
  • Find your logo as a proper file, not a screenshot. Collect a handful of good photos of your work, premises or team.
  • Choose the one person who approves the site.
  • Pick two or three websites you like, and write a sentence on what you like about each.
  • List the pages you think you need. Most small business sites start with home, services, about and contact.
  • Note where your email is set up. With us, only the website is pointed across and your email stays where it is.

How do you tell if a quoted timeline is realistic?

A date on its own tells you little. These questions show what sits behind it. They work with any designer or studio, including us.

  • When does the clock start: at signing, at the first payment, or when I hand over my content?
  • What do you need from me, and by when? A good answer is a short list with dates.
  • How many rounds of changes are included, and how long does each one take?
  • Who looks after the domain and the move across? What happens if my old provider is slow?
  • What happens to the date if I am late with my content? What happens if you are late?
  • Can I see the design before I pay?
  • Will you put the date in writing?

Be careful with a very short date from someone who has not asked for your content. Be careful too with a long date that comes with no reasons. A short date can be real when the site is small and the content is ready. A long one can be real when the project is big. Either way, you should be able to get the reasons.

Questions people ask

Can a website be built in a day?

A one-page site can, if the words, photos and logo are ready and you already control the domain. A full small business site takes longer, because the content and the checking take time. A Standard site from WebTag is live within 48 hours of getting your details, logo and photos.

Does a faster build mean a worse site?

Not by itself. Most of the time in a project goes on content and waiting, so a quick build with good material can be as good as a slow one. Our Standard site is built from our own layouts and styled to your brand, which is part of why it is quick. What does hurt a site is thin content and skipped checks. Ask what is included, and look at the design before you pay.

When does the clock start?

It depends on the studio, so ask. With us, a Standard site is live within 48 hours of getting your details, logo and photos, so the clock starts when those arrive.

How long until Google shows the new site?

It varies, and nobody can promise a time or a position in Google, including us. Before launch, check that the site is not set to ask search engines to stay away, which is easy to leave switched on by mistake. If you are replacing an old site, we keep your old page addresses where we can, or redirect them to the new pages.

Will my email stop working when the new site goes live?

It should not. Only the website is pointed across, and your email stays where it is. Ask whoever moves the site to confirm that before the switch.